Custom wiring for a Cell on Wheels deployable communications trailer

How Complete Wiring built and tested the cabling behind a rapid deployment unit that replaces mobile and wireless coverage for emergency services.

Industry:

Telecommunications and communications

Application:

Cell on Wheels (CoW) deployable communications trailer, carrying cellular antenna, satellite and transceiver equipment

Deployment conditions:

Road transport, exposure, heat, dust and remote sites. Set up at speed by field crews

Manufactured:

Capalaba, Brisbane

Capability used:

Custom cable and wire harness assembly, 100% unit testing, controlled manufacturing documentation

Standards:

AS/NZS ISO 9001:2015 quality management, IPC/WHMA-A-620 workmanship

What this unit had to do

A Cell on Wheels looks like a trailer. It is a mobile base station, carrying cellular antenna, satellite and transceiver equipment that can be towed in and stood up where the network no longer exists.

It gets used at the worst possible moment. After a bushfire or a flood takes out fixed infrastructure, or in country with no coverage to begin with, emergency services depend on the unit for the communications they coordinate the response through.

That creates a demanding brief for the wiring inside it. The unit spends most of its life parked and idle, then has to work first time, in poor conditions, set up quickly by a field crew who did not build it. Every kilometre of towing is vibration. Every deployment is heat, dust, weather and handling. There is no second attempt and often no technician within reach.

What Complete Wiring supplied

Complete Wiring designed and manufactured the custom cabling and wiring for the Cell on Wheels at our Capalaba facility in Brisbane, working to the approved requirements for the unit.

Designing wiring for equipment that has to survive the trip

Deployable equipment fails differently to fixed equipment. It fails from movement, handling and time spent doing nothing, not from continuous running. That changes what the wiring has to be built to withstand.

  • Design and manufacturability input: we work through the application with you before production, so routing, strain relief, terminations and serviceability are settled at the design stage rather than discovered in the field.
  • Component selection for the application: components are selected against the approved requirements, including the transport, environmental and handling conditions the unit has to withstand.
  • Workmanship standard: cable assemblies and wire harnesses are manufactured in accordance with IPC/WHMA-A-620 requirements. Relevant quality personnel receive IPC-related training and are supported by an in-house certified IPC trainer.
  • Clear identification: labelling and identification are documented for the job, so a crew setting the unit up under pressure, or servicing it later, can see what connects where.
  • Controlled documentation: drawings, materials, activities and inspection checkpoints are documented, so the build is consistent and the records exist afterwards.

100% unit testing before the trailer leaves

Testing is part of manufacturing at Complete Wiring, not a final look before dispatch. Every production item is individually tested rather than batch sampled.

For an asset that sits idle until an emergency, that is the point. A fault found on the bench is a small problem. The same fault found on a fire ground is a communications blackout during a disaster response.

Testing is defined by the approved requirements for the job and may include:

  • Visual inspection
  • Continuity testing
  • Insulation testing
  • Computer-controlled CableEye testing
  • Conformity checks against approved drawings and documentation
  • Customer-specific checks where documented and agreed

Test results are recorded where required by the approved manufacturing documentation.

Learn more about our quality system, training and testing

Building the second unit the same as the first

Deployable communications assets are rarely a one off. Operators build fleets, add units over several years, and need the next trailer to be the same as the last one so crews are not learning a different layout in an emergency.

Retained drawings, production information and records support future production against the approved requirements, so a repeat unit or a replacement harness can be built to the same specification. Components can be traced from purchasing and supplier information through the relevant work order into finished production.

That also covers the long tail. Communications equipment stays in service well past the life of the original supplier or drawing package, and we reproduce existing harnesses where the original product, documentation or supplier is no longer available.

The result

The completed Cell on Wheels left our facility ahead of Australia’s peak bushfire season, ready to be deployed where fixed communications infrastructure is damaged or does not reach.

Every cable and wire in the unit passed Complete Wiring’s 100% unit testing process before dispatch, giving the customer a documented, tested wiring solution built for the conditions the unit gets used in.

Building deployable or field-based communications equipment?

If you build, integrate or operate deployable communications assets, portable base stations, satellite units, network equipment or multi-site installation kits, the same approach applies. We work from your drawings, BOM, specification or sample, review it for manufacturability, build to controlled documentation, and test every item before it leaves Capalaba.

There is no minimum order value. We support one-off prototypes and small batches, and scale into larger production runs or repeat fleet builds as the programme grows.

See our full telecommunications and communications capability

Read about cable and wire harness assembly and design to manufacture

Frequently asked questions

Yes. We manufacture custom cable assemblies and wire harnesses for equipment that is towed, transported and set up in the field, including units carrying antenna, satellite and transceiver equipment. Send us the deployment and environmental conditions along with your drawings or specification.

We are ISO 9001:2015 quality assured, and our cable and harness assemblies are made to IPC/WHMA-A-620, supported by a certified IPC trainer on staff. This gives mining and other regulated buyers a documented quality system to assess.

Yes, where the approved requirements still apply. Retained drawings, production information and records support repeat production, so a second trailer or a replacement harness matches the original rather than being redesigned.

Yes. We reproduce and redevelop existing harnesses for equipment still in service after the original product, documentation or supplier is no longer available, which is common in communications equipment with a long service life.

Delivery requirements are agreed at quote stage, once we have reviewed the application, components, quantities and scope. This unit was completed and dispatched ahead of Australia’s peak bushfire season.

Send drawings, a BOM, a specification, a sample, photographs of an existing unit or an outline of the requirement. We review the application, components, quantities and scope before confirming what we can build and how it will be tested.

Talk to our team about your project

Send us your drawings, specifications, a sample or an outline of your requirement. We will come back to you with a practical, production-ready response.

Send your drawings

• The telecommunications industry page currently has no case study link, and its case study card is held generic pending Matt’s confirmation of the Telstra detail. Add a link from that page to this project page so the industry page has live proof while the Telstra content is resolved.

• Schema: BreadcrumbList for the Projects path, and FAQPage for the visible FAQ section only if the answers remain visible in the page source.

• Images: descriptive file names, for example cell-on-wheels-custom-wiring-complete-wiring-brisbane.jpg and deployable-communications-trailer-harness-testing-capalaba.jpg.

• Moved the page from News to the Projects section, with a 301 redirect from the old URL.